Temporary KEMH road closure on Thursday 14 August

Tuesday 12 August 2025: Bermuda Hospitals Board (BHB) today advises that the road on the KEMH campus that connects Berry Hill and Point Finger Roads will not be accessible as a through road on the morning of Thursday 14 August, from about 7:30am through to noon.

The road will be blocked near the Orthopaedic (Fracture) Clinic entrance (the old Emergency Department). People will be able to walk from Berry Hill Road and access the entrance, but will not be able to drive through.  People coming from Point Finger Road will be able to access up to the General Wing lobby and Agape House.

The road closure is required for the removal of the 18-year-old nuclear medicine equipment. This equipment is being replaced as part of the Diagnostic Imaging replacement project announced in February. New equipment will be installed after the area has been prepared.

The nuclear imaging service is closed until about 24 September while the work is undertaken.

Archives

2025 (38)
2024 (49)
2023 (30)
2022 (58)
2021 (67)
2020 (66)
2019 (45)
2018 (35)
2017 (40)
2016 (47)
2015 (22)
2014 (45)
2013 (36)
2012 (37)
2011 (43)
2010 (44)
2009 (56)
2008 (31)
2007 (32)
2006 (39)
2005 (27)
2004 (23)